Home > Education > Page 3

    Our Projects

    Education

    Heathside School, Weybridge

    June 7, 2021
    Waverley were approached by contractor Woodland Commercial Projects to design, manufacture and install a large canopy to provide sixth form students with a covered breakout area that could be used in all weathers. Design challenges & solutions The canopy structure needed to be independent of any existing buildings and to be robust enough to withstand [โ€ฆ]

    Cleeve Park School, Sidcup

    June 7, 2021
    Cleeve Park School is a secondary school in Sidcup, Kent.  Following a detailed tendering process, Waverley were awarded the task of providing the students at the school with a larger outside covered area in the schoolโ€™s main courtyard. The requirement The school management wanted to enhance the facilities for students at break times, by providing [โ€ฆ]

    Flitch Green Academy, Dunmow

    June 7, 2021
    Waverley supplied & installed a free-standing aluminium canopy for Beardwell Construction as part of a refurbishment and extension project at this progressive primary school. The existing building presented a design challenge with the position of existing external solar shading fins meaning that the canopy would have to over sail the fins to provide adequate protection [โ€ฆ]

    Chipstead Valley Nursery, Chipstead

    June 7, 2021
    Willmott Dixon awarded the canopy & buggy shelter requirements on this new-build nursery school project to Waverley. Working against the clock to complete before the start of the autumn term, Waverleyโ€™s short lead time and competitive pricing were crucial to the overall success of the project. Waverleyโ€™s Weatherspanยฎ aluminium canopy consists of a number of [โ€ฆ]

    Berryfields Primary School

    June 7, 2021
    Buckinghamshire County Council commissioned Waverley to supply and install a 15m x 4m  free-standing canopy  at Berryfields Primary School, to create a stimulating outdoor learning environment adjacent to the new-build extension. Unable to fix the canopy to the building so as not to exert any load, the canopy was required to stand as close as [โ€ฆ]

    St. Josephโ€™s Primary School

    June 7, 2021
    St. Josephโ€™s Primary school in Aldershot caters for children aged 4 โ€“ 11, and recently underwent building works, to increase the school size and facilities. This extension programme included a large WeatherSpan canopy from Waverley that adds over 175 m2 of covered learning space adjacent to classrooms. St Josephโ€™s had installed two WeatherSpan canopies some [โ€ฆ]
    • Max. file size: 512 MB.
    • This field is for validation purposes and should be left unchanged.
  • Download our brochure

    • This field is for validation purposes and should be left unchanged.