Home > Our Projects

Our Projects

St. Joseph’s Primary School

June 7th, 2021
St. Joseph’s Primary school in Aldershot caters for children aged 4 – 11, and recently underwent building works, to increase the school size and facilities. This extension programme included a

Luxury House, Bosham

May 27th, 2021
This new build luxury home was constructed by contractors R W Armstrong & Sons Ltd.  Waverley were involved at an early stage in the specification of blinds and curtains to this project, and afte

Highcombe Edge School

June 7th, 2021
With restricted budgets but limited classroom space, the school were looking for a robust, economical and maintenance free canopy solution to cover the new timber decking area. The 20m x 4m canopy pro

Slough & Eton CE School

June 7th, 2021
Slough and Eton School needed to provide shelter for students in inclement weather as well create an area where notice boards could be displayed without risk of damage from the elements. As the school

Oak Green School

June 7th, 2021
Oak Green School, Aylesbury have undergone major refurbishment works to facilitate an increase in student numbers. Integral to the scheme was the introduction of outdoor play areas for the reception c

Bullers Wood School

June 7th, 2021
Bullerswood School for Girls needed a large covered area outside the tuckshop, to create a sheltered eating area for the students. Waverley installed canopies to create a total of 115 square metres of
    • Max. file size: 512 MB.
    • This field is for validation purposes and should be left unchanged.
  • Download our brochure

    • This field is for validation purposes and should be left unchanged.